A full refurbishment of this 320 room hotel in Mayfair was completed by our engineers. Ventilation was required throughout, bespoke systems accommodating our clients needs from the Grand ballroom, the catering facilities to each and every individual bedroom.
A brand new Virgin Active at Mansion House requiring ventilation to the new pool, gym, studios and changing rooms.
With the new trend of large developments providing their own power, the CHP units that are built to facilitate this require dedicated ventilation systems around them, this specific site was on the original Old Brewery site in Wandsworth.
With 30 years of experience we have undertaken projects in every field imaginable.
From the Millenium Dome to Apple stores, Harvey Nichols to Broadmoor hospital.
Fulfilling the ventilation requirements of both smaller bespoke clients & multinational corporations.
We carried out works airside at heathrow, redirecting warm air away from the baggage carousels. Stringent security checks and working hours made this a tricky site but with our standard protocols in place the project was completed to our high standard.
With stores opening at such a rapid rate, speed and efficiency are required to work for Sainsbury's. Hitting tight deadlines and working out of hours with good communication at site level are key. We have completed in the region of 90 stores for Sainsbury's.
Working at this Grade II listed building amongst its beautiful features is both an honour and a challenge. Tight ceiling voids, limiting noise breakout and working around the performance schedule require some serious planning and imagination. We have now been working in London's most prestigious theatres for the past 12 years.
Copyright © 2018 Croydon Ductwork Ltd - All Rights Reserved.